2017
Repair of the dispatch driveway and start of construction of the production hall for the sawmill.
Purchase of a P2Lean: “Compact bending center 4.0” from Salvagnini.
2015
Acquisition of a new 5kW laser cutting plant “TrueLaser 5030 FIBER” with and automatic loading and unloading unit from Trumpf.
2014
Participation in the the dlv – Netzwerk Ladenbau e.V. on the fair Euro Shop 2014 in Düsseldorf
2013
Construction of a powder coating plant with automatic powder application including decentral combined heat and power station.
Investment in a photovoltaic plant.
2012
For the first time the company presents at the branch fair ZOW in Bad Salzuflen.
On time to the ZOW 2012 Broki Metallwaren introduces his new web site.
2011
Expansion of the grounds of the operation by means of purchasing the adjacent property with a size of 7,500 m². We are certified as a welding operation in compliance with DIN EN 15085-2.